Menghitung TARPS dan CRPS Program TV
No.
|
Program
|
Dur
|
Rate
(Rp)
|
Total Spot
|
Total
Value
|
Tvr
|
TARPS/
GRP
|
CRP
(Cost Per Rating)
|
1
|
Dahsyat – RCTI
|
15”
|
13.200.000,00
|
14
|
184.000.000,00
|
2.1
|
29.4
|
6.258.503,40
|
2
|
Tendangan Si Madun– SCTV
|
15”
|
15.000.000,00
|
10
|
150.000.000,00
|
2.4
|
24
|
6.250.000,00
|
3
|
Inbox – SCTV
|
15”
|
12.000.000,00
|
12
|
144.000.000,00
|
1.3
|
15.6
|
9.230.769,23
|
4
|
Opera Van Java– TRANS 7
|
15”
|
21.000.000,00
|
9
|
189.000.000,00
|
3.6
|
32.4
|
5.833.333,33
|
Total
Spot
|
45
|
|||||||
Total
Value
|
667.800.000,00
|
|||||||
Rumus
:
TARPSà
TVR (rating) x spot
§ 14
x 2.1 = 29,4
§ 10
x 2,4 = 24
§ 12
x 1,3 = 15,6
§ 9
x 3,6 = 32,4
CPRPà
Total value / TARPS
o 184.000.000
x 29,4 = 6.258.503,40
o 150.000.000
x 24 = 6.250.000,00
o 144.000.000
x 15,6 = 9.230.769,23
o 189.000.000
x 32,4 = 5.833.333,33